Homes and businesses near HS2 could benefit from better mobile reception and faster broadband, according to the company building the high-speed railway.

Government-owned HS2 Ltd said mobile network and broadband providers will be able to purchase access to spare capacity in its fibreoptic cabling and telecoms masts.

It believes this could significantly reduce the cost of bringing fibre connections to rural areas just across the Oxfordshire border in parts of Buckinghamshire and Northamptonshire.

READ MORE: Start of critical HS2 bridge foundation work over A43

And there are plans to introduce 5G connections along the new East West Rail route between Oxford and Milton Keynes.

HS2 Ltd commissioned analysis of data held by regulator Ofcom which identified 538 postcodes within five kilometres (3.1 miles) of the route between London and Birmingham, which do not have access to so-called ultrafast broadband speeds of more than 100 megabits per second (Mbit/s).

That includes 209 postcodes where even speeds of 10Mbit/s are not available.

Some 15 postcodes on the route do not receive reliable 5G mobile signal.

Rail minister Lord Hendy said: “Investment in our transport infrastructure can boost opportunities and drive economic growth in every part of our country.

“This scheme will have a positive impact on local areas for generations to come, providing connectivity that will create new opportunities for people and businesses to thrive.”

HS2 Ltd is building around 80 telecoms masts to provide signalling for trains, with approximately 2,000 kilometres (1,243 miles) of fibreoptic cabling running alongside the tracks.

HS2 work taking place HS2 work taking place (Image: HS2)

The company’s head of telecoms engineering Tim Ward said it is “determined to ensure that we get the most value out of our new infrastructure and support the local community wherever possible”.

He went on: “That’s why we’re keen to work with mobile and broadband providers to help unlock better 5G connectivity and faster broadband for communities in more isolated areas along the railway.”

On existing intercity services, passengers’ mobile devices access data from each telecoms mast the train passes, which can lead to reduced bandwidth and occasional dropouts.

HS2 Ltd said new technology means it will be possible for data to be “fed directly” to its trains, which would “dramatically” improve the quality of connections.

Engineers have been installing a viaduct at Westbury on the Oxfordshire and Buckinghamshire border in recent months.

Construction work has also been taking place on the HS2 bridge which will maintain the important A43 road link between Oxford, Brackley, and Northampton.

The roadway provides key access to Silverstone and acts as a connector between the M40 and M1.

HS2 partnered with National Highways to create a 'island' between the two carriageways, spacious enough to accommodate new bridge deck construction.